Nearly 100% of the internet’s activity flows through data centers

On the surface, building a data center may seem like any other industrial project. You secure a site, line up your contractors, and start building. But in reality, data center construction rarely plays out that cleanly.

Projects that seem perfectly viable early on can run into issues fast. Maybe power isn’t available when you need it, or key equipment gets stuck on backorder, or the site turns out to be more complicated than expected once you get into the details. What at first looked like a clear path forward suddenly spirals into delays, redesigns, or budget creep if those risks aren’t accounted for early.

This is the real challenge with data center construction right now. It’s not just about executing the build; it’s about understanding where things tend to go sideways and having a plan to deal with it before that can happen.

Power Constraints and Site Realities

If there is one single issue defining data center construction right now, it’s power.

Even just a few short years ago, developers were mostly focused on finding the right piece of land. Today, land is only part of the equation. Data center power usage far exceeds the needs of most other industrial structures, so what really matters now up front is whether a potential site can support data center power demands and how long it will take to get connected to the grid.

In some markets, those interconnection timelines can stretch out for years. If project stakeholders fail to factor that in from the beginning, it can push a project toward failure before it even gets moving.

There are also site-specific challenges that don’t always show up on paper. Environmental conditions, permitting requirements, and existing infrastructure can all complicate development getting past the planning phase.

The solution begins with flipping the traditional process. Instead of leading with land, teams are starting with power concerns first by evaluating grid capacity, utility relationships, and interconnection timelines before all else. From there, site selection becomes more targeted and realistic.

There’s also a growing emphasis on flexibility. That might mean incorporating on-site generation using renewable energy, battery storage, and generators; planning for phased capacity; or identifying redevelopment opportunities where infrastructure can be upgraded rather than built from scratch.

This is where having access to the right real estate insight can make a difference. Teams that understand both the construction side and the property landscape are often better positioned to spot viable sites earlier and avoid wasting time on ones that won’t pencil out.

Supply Chain Delays and Build Complexity

Even when the site and power pieces are lined up, another challenge tends to show up pretty quickly: getting everything you need to actually build the facility.

Data centers rely on specialized equipment—switchgear, generators, cooling systems, cabling, etc.—that isn’t always easy to source. Lead times can be long, and they’re not always predictable. One delayed component can throw off an entire construction schedule.

At the same time, the builds themselves are getting more complex. Higher-density environments generate a significant amount of heat, which puts added pressure on cooling systems. Electrical and mechanical systems have to be tightly coordinated. There’s less room for error and less flexibility once construction is underway.

Frank Crivello, founder and chairman of Phoenix Investors, puts it simply:

“Most of the delays happening in data center projects don’t come from the construction itself. They come from everything else happening around it. Power availability, equipment lead times, site constraints all play a pivotal role in keeping your project on the rails. If you’re not planning for those things up front, you’re already behind from the start. The teams that succeed are the ones that take a more integrated approach from the jump.”

That “everything around it” is where projects are won or lost.

To stay ahead of these issues, teams are starting procurement earlier—sometimes even during the design phase—to lock in long-lead equipment. There’s also a bigger focus on coordination. Deliveries need to be timed with construction milestones, not just scheduled whenever materials are available.

Logistics plays a much bigger role here than it used to. Moving large, sensitive equipment isn’t simple, and delays don’t just happen at the supplier level. They also happen in transit, at staging points, and on-site.

When construction and logistics are aligned from the beginning, it’s easier to keep things moving. When they’re not, small delays tend to snowball.

Building Through Complexity

Data center construction isn’t getting easier. If anything, the challenges are stacking up: power constraints, supply chain pressure, more complex builds, tighter timelines, and more all influence the success of your project.

Some data center construction firms will tell you that these issues are inevitable in today’s market. But projects don’t have to stall out. The difference usually comes down to how early those challenges are addressed and how connected the approach is across planning, construction, and execution. Teams that think proactively by treating these issues as part of the process, instead of being caught by surprise, are much more likely to stay on track.

At this point, it’s less about reacting to problems and more about seeing them coming. And in a market where speed and reliability matter as much as they do, that shift in approach can make all the difference.